PROCESS FLOW DIAGRAM




COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER DRAWING LEVEL
PART NAME REV No.
PART No. DATE INITIATED
    LAST REVIEW DATE
WEBROY STOCK CODE REVISION DATE 2021/08/24
MANUFACTURING LOCATION Webroy STATUS
MQC TYPE SAFETY CRITICAL
Current
Process Flow Key

Process TypeImage
PROCESS
MOVE
STORE
INSPECT


STEPCost CentrePROCESSOPERATION DESCRIPTIONCLASSPRODUCT AND PROCESS CHARACTERISTICSCONTROL METHODS 
1500 Receiving and verification of raw material by stores personel Mild black wire 4.0mm as per purchase orderVerification of delivery note and order placed. Any discrepancy, place raw material on hold and inform production planner, supplier and raise SRAN.
2500 Move material to receiving storage area Safe handling during transport and handling activityVisual inspection
3505 Inspection of raw material by Q.A SC Mild black wire, 4mm +/- 0.05, MATERIAL = SAE 1010 ,tensile range = 530mpa - 630mpa. No pitted rust, no score marks, no excessive drawing soap. Check wire diam. With micrometer - Visual inspection of condition of wire - Compare tensile strength, grade and spec against COA from supplier - record on incoming inspection document QD:40.
4500 Move raw material to storage area for storage Safe loading and handling during this activityVisual inspection during this activity. Competent forklift driver. FIFO system to control material.
5500 Issue wire to production Correct identification of wireMaterial buff tag, visual inspection
615 Select 4mm tooling / select 100% T6 wire program and set - MICRO MAC Machine Correct setting of machine. Visual verification
715 In process inspection SC Correct fitment on checking fixture. Visual inspection on in-process checking fixture. Visual inspection for burrs. Record on attribute sampling sheet QD:203
815 Pack formed wire products onto Kanban tolleys pack wire as per kanban quantityPhysical counting of products
915 Send over mould long wires to supplier for over moulding of products SC As per drawing requirementsVisual inspection
10500 Receive over mould long wires from supplier - receipt into stock SC Products must conform to drawing specificationsVisual inspection and of moulded wires
11500 Issue over mould long wires to production Safe handling and packing of productsVisual inspection
126 Transport to manufacturing area As per job quantitiesVisual verification
136 Call-up 100% welding program from control unit at Robotic welder Ensure correct program is selectedVisual verification
146 Load welding jig and manufacture first-off sample CC First off sample must conform to checking fixture and drawing requirementsVerification on checking fixture
156 Re-weld frame SC (Isolate from production - place onto reweld stand. Until frame can be manually rewelded. Scrap parts place on reject trolley to be scrapped at end of shift. Frame should be rewelded at the marked pointVisual inspection of re-weld points and validate frame onto Final Checking Fixture for fitment.
166 In process inspection of finished frames CC Frames must conform to checking fixture, must be flat, not twisted, no bent wires , no loose weldsVisual verification checking fixture - 100% inspection during production
176 Pack frames into card board boxes Correct FELT001 card board box. Correct quantities and Correct labellingVisual inspection
186 Move completed frames to stores using pallet jack Safe loading and transporting of framesVisual inspection
19500 Receive boxes into storage area Correct quantities of framesVisual inspection Confirmed orders
20500 Invoice and ship frames to customer As per order placementVerification of quantities as per sales order and delivery note
21505 Internal product and shipment audits Product and Shipment audits to meet criteria as per customer requirements and drawing requirementsCompetent auditors conducting internal audits as per schedule