| STEP | Cost Centre | PROCESS | OPERATION DESCRIPTION | CLASS | PRODUCT AND PROCESS CHARACTERISTICS | CONTROL METHODS |  | 
			| 1 | 500 |   | Receive and verify quantity and type of raw material - by stores personnel |  | 4.5mm lightly oiled Copper coated wire as per purchase order | Verification of delivery note and order placed. Any discrepancy - contact supplier and resolve |  | 
			| 2 | 500 |   | Move raw material to incoming receiving area |  | Safe handling during transport and handling activity | Visual inspection |  | 
			| 3 | 505 |   | Inspection of raw material by QA Personnel | SC | Mild steel 4.5mm lightly oiled Copper coated 
Wire Tolerance +/- 0.08mm. Copper 1.5g/m2 - Verify as per COA
No score marks, no rusty wire - compare tensile strength with COA and spec - correct grade | Check wire diam with micrometer. Visual inspection of condition of wire. COA from supplier. Record on on-line inspection |  | 
			| 4 | 500 |   | Move raw material to storage area |  | Safe handling and loading during this activity | Visual inspection during this activity. Competent Hyster driver. FIFO System to control material |  | 
			| 5 | 500 |   | Issue wire to production |  | Correct identification of wire | Material buff tag, visual inspection |  | 
			| 6 | 15 |   | Load wire coil onto swift at Micro Mac and Zukron Machine |  | Safe loading and handling during this activity | Visual inspection during this activity. Competent Hyster driver |  | 
			| 7 | 15 |   | Form individual wires as per route card on Micro Mac / Zukron Machine | SC | As per correct fitment in checking fixture. No burrs allowed. Correct length of star wire - As per CF. | Visual inspection on in-process checking fixture.
Visual inspection for burrs and coating variance.
Record on BIS Card and on-line inspection. |  | 
			| 8 | 15 |   | Pack formed wires in KANBAN |  | Correct loading of wires on KANBAN system | KANBAN System |  | 
			| 9 | 16 |   | Dressing and cleaning of copper tips | SC | To ensure consistent welds | Copper tip height measurement.
File tips every 2 hours. |  | 
			| 10 | 16 |   | Weld Pull Test | CC | 4.5mm x 4.5mm Min 2400N, Max 9600N | Use Tensile tester to pull the sample wires and determine the point at which the wire or weld breaks. The reading should be between the min and max spec. |  | 
			| 11 | 16 |   | Load wires on welding jigs and start welding frames |  | No loose wires, no burrs and hold downs correctly fitted | Visual inspection |  | 
			| 12 | 16 |   | Welding of frame | CC | Weld frame as per customer requirement. First-off sample must conform to drawing requirements | Visual inspection of frame after welding. Verification in checking fixture - record on BIS Card and on-line inspection . Should the frame not fit the checking fixture , stop process and report to supervisor |  | 
			| 13 | 16 |   | Place identification label | SC | Place Identification Tag on wire 3 after welding process on wire | Visual inspection and ensure label sealed correctly to avaoid it from coming loose. |  | 
			| 14 | 16 |   | Nibble all protruding wires and polish sharp edges when required |  | No burrs/ sharp edges allowed on frame | Visual and physical inspection by hand |  | 
			| 15 | 16 |   | Re-welding | CC | Any re-weld frame shall be marked at the re-welding point using a maker before welding process and then check on checking fixture for fitment. Weld Criteria to meet the same as those defined in the "Weld Frame" process above | Inspection after reweld is the same as defined in the process "Welding of Frame". Goods are to be validated in the final checking fixture |  | 
			| 16 | 16 |   | Final inspection of frames | SC | Frame must conform to final checking fixture, must fit flat in fixture slots , not twisted, no bent wires , no loose welds, no miss coating, identification label secure, no protruding or unnibbled wires, no rust on frame and missing wires. No burrs. No excessive protrusion of star wire. | Visual verification of fitment of frame and welds |  | 
			| 17 | 16 |   | Handling of non conforming frames | SC | Frames need to be isolated from production placed on reject stand. | Reject frames to be captured on system and disposed before end of shift. |  | 
			| 18 | 505 |   | Critical dimensions | SC | 5 critical dimensions to measure on frame per jig monthly and complete cpk. | Measure frame using tape measure, square and vernier |  | 
			| 19 | 16 |   | Packing of frames |  | 100 frames per chep bin. 
Place label on bin No damage to frames. | Competent packer |  | 
			| 20 | 16 |   | Transport full CHEP bins to stores area for shipment |  | Safe loading and transportation of frames | Competent forklift driver |  | 
			| 21 | 500 |   | Receive full CHEP bins into stores area for shipment |  | Correct containers and correct quantities | Visual inspection
Confirmed orders |  | 
			| 22 | 500 |   | Dispatching of frames to customer |  | Correct quantities. 
Correct labelling | Order request. Approved transporter Create invoice/delivery note |  | 
			| 23 | 16 |   | Verification and checking of welding jigs |  | No visual damage to welding jigs, no worn out slots | Visual inspection done by operator |  | 
			| 24 | 505 |   | Verification and checking of individual checking fixtures |  | No visual damage | Visual inspection by QA Personnel |  | 
			| 25 | 505 |   | Verification and checking of Final checking fixture |  | Checking fixture dimensionally correct | CMM report |  | 
			| 26 | 505 |   | Internal product audit |  | As per drawing requirements | Audit check sheet including dimensional report for 1 complete frame |  |