PROCESS FLOW DIAGRAM




COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER DRAWING LEVEL
PART NAME REV No.
PART No. DATE INITIATED
    LAST REVIEW DATE
WEBROY STOCK CODE REVISION DATE 2024/08/29
MANUFACTURING LOCATION Webroy STATUS
MQC TYPE SAFETY CRITICAL
Current
Process Flow Key

Process TypeImage
PROCESS
MOVE
STORE
INSPECT


STEPCost CentrePROCESSOPERATION DESCRIPTIONCLASSPRODUCT AND PROCESS CHARACTERISTICSCONTROL METHODS 
1500 Receive and verify quantity and type of raw material - by stores personnel 4.5mm lightly oiled Copper coated wire as per purchase orderVerification of delivery note and order placed. Any discrepancy - contact supplier and resolve
2500 Move raw material to incoming receiving area Safe handling during transport and handling activityVisual inspection
3505 Inspection of raw material by QA Personnel SC Mild steel 4.5mm lightly oiled Copper coated Wire Tolerance +/- 0.08mm. Copper 1.5g/m2 - Verify as per COA No score marks, no rusty wire - compare tensile strength with COA and spec - correct grade Check wire diam with micrometer. Visual inspection of condition of wire. COA from supplier. Record on on-line inspection
4500 Move raw material to storage area Safe handling and loading during this activityVisual inspection during this activity. Competent Hyster driver. FIFO System to control material
5500 Issue wire to production Correct identification of wireMaterial buff tag, visual inspection
615 Load wire coil onto swift at Micro Mac and Zukron Machine Safe loading and handling during this activityVisual inspection during this activity. Competent Hyster driver
715 Form individual wires as per route card on Micro Mac / Zukron Machine SC As per correct fitment in checking fixture. No burrs allowed.Visual inspection on in-process checking fixture. Visual inspection for burrs and coating variance. Record on BIS Card and on-line inspection.
815 Pack formed wires in KANBAN Correct loading of wires on KANBAN systemKANBAN System
916 Dressing and cleaning of copper tips SC To ensure consistent weldsCopper tip height measurement. File tips every 2 hours.
1016 Weld Pull Test CC 4.5mm x 4.5mm Min 2400N, Max 9600N Use Tensile tester to pull the sample wires and determine the point at which the wire or weld breaks. The reading should be between the min and max spec.
1116 Load wires on welding jigs and start welding frames No loose wires, no burrs and hold downs correctly fittedVisual inspection
1216 Welding of frame CC Weld frame as per customer requirement. First-off sample must conform to drawing requirementsVisual inspection of frame after welding. Verification in checking fixture - record on BIS Card and on-line inspection . Should the frame not fit the checking fixture , stop process and report to supervisor
1316 Place identification label SC Place Identification Tag on wire 3 after welding process on wireVisual inspection and ensure label sealed correctly to avaoid it from coming loose.
1416 Nibble all protruding wires and polish sharp edges when required No burrs/ sharp edges allowed on frameVisual and physical inspection by hand
1516 Re-welding CC Any re-weld frame shall be marked at the re-welding point using a maker before welding process and then check on checking fixture for fitment. Weld Criteria to meet the same as those defined in the "Weld Frame" process above Inspection after reweld is the same as defined in the process "Welding of Frame". Goods are to be validated in the final checking fixture
1616 Final inspection of frames SC Frame must conform to final checking fixture, must fit flat in fixture slots , not twisted, no bent wires , no loose welds, no miss coating, identification label secure, no protruding or unnibbled wires, no rust on frame and missing wires. No burrs.Visual verification of fitment of frame and welds
1716 Handling of non conforming frames SC Frames need to be isolated from production placed on reject stand. Reject frames to be captured on system and disposed before end of shift.
18505 Critical dimensions SC 5 critical dimensions to measure on frame per jig monthly and complete cpk.Measure frame using tape measure, square and vernier
1916 Packing of frames 100 frames per chep bin. Place label on bin No damage to frames.Competent packer
2016 Transport full CHEP bins to stores area for shipment Safe loading and transportation of framesCompetent forklift driver
21500 Receive full CHEP bins into stores area for shipment Correct containers and correct quantitiesVisual inspection Confirmed orders
22500 Dispatching of frames to customer Correct quantities. Correct labellingOrder request. Approved transporter Create invoice/delivery note
2316 Verification and checking of welding jigs No visual damage to welding jigs, no worn out slotsVisual inspection done by operator
24505 Verification and checking of individual checking fixtures No visual damageVisual inspection by QA Personnel
25505 Verification and checking of Final checking fixture Checking fixture dimensionally correctCMM report
26505 Internal product audit As per drawing requirementsAudit check sheet including dimensional report for 1 complete frame