STEPCost CentrePROCESSOPERATION DESCRIPTIONCLASSPRODUCT AND PROCESS CHARACTERISTICSCONTROL METHODS 
1500 Receiving and verification of raw material by stores personel Mild Black Wire 4.0mm mild black wire as per purchase orderVerification of delivery note and order placed . Any discrepancy
2500 Move material to receiving storage area Safe handling during transport and handling activityVisual inspection
3505 Inspection of raw material by Q.A CC Mild black 4mm wire , wire tolerance +/- 0.05mm , No score marks , no rusty wire , compare tensile strength with COA and spec - correct gradeCheck wire diameter with micrometer. Visual inspection of condition of wire. COA from supplier. Record on incoming inspection document. Rod spec from supplier
4500 Move raw material to storage area for storage Safe loading and handling during this activityVisual inspection during this activity . Competent forklift driver , FIFO system to control material
5500 Issue wire to production Correct identification of wireMaterial buff tag Visual inspection
615 Form individual wires on Zukron / Huron. Correct setting of machine Products to conform to checking fixtureRecord on BIS Card and Attribute sampling sheet QD:203 Checking fixture verification
7104 Press Brackets Products need to conform to drawing specifications.Visual verification
8104 Transport brackets to Co2 weld station Correct handling of brackets during this activityVisual verification
9203 Overmould wire 3 CC No damage to product/ control packaging / correct quantityVisual inspection
10203 Transport over moulded wire 3 to Co2 weld station Correct handling of parts during this activityVisual verification
116 Load welding jig Ensure all wires and brackets are seated correctly and hold down clamps are in place. Ensure no gaps in between wires or wires and bracketsVisual verification
126 Weld Frame SC First-off sample must conform to drawing requirementsVerification on checking fixture - record on BIS Card . Should the parts not fit the checking fixture , stop process and report to supervisor
136 Inspect welded frame SC Ensure the welded frame fits the final checking fixture. Ensure no loose or broken weldsVisual inspection and checking fixture.
14505 Final inspection SC Frame shall conform to final checking fixture, must be flat in C/F grooves, no loose or broken welds.Visual verification of fitment of frame and welds
156 Rework / Reweld Process SC Weld Criteria to meet the same as those defined in the "Weld Frame" process aboveInspection after rework/reweld is the same as defined in the process "Inspect Welded Frame". Goods are to be validated in the final checking fixture and remarked with orange Marker
166 Pack products into carboard boxes As per packaging requirementsDescription of product as per packaging requirments
176 Move completed boxes to stores using pallet jack Safe loading and transporting of framesVisual verification
18500 Receive boxes into stores area for shipment Correct quantities of frames Visual inspection Approved transporter
19500 Dispatching of frames Safe handling of boxes during this activityVerification of quantities as per sales order and delivery note
20505 Lay-out inspection All requirement stipulated on drawing and customer requirementsCompetent Q.A personnel conducting inspections