STEPCost CentrePROCESSOPERATION DESCRIPTIONCLASSPRODUCT AND PROCESS CHARACTERISTICSCONTROL METHODS 
1500 Receiving and verification of raw material by stores personel Spring Black Wire 1.2mm wire as per purchase orderVerification of delivery note and order placed . Any discrepancy
2500 Move material to receiving storage area Safe handling during transport and handling activityVisual inspection
3505 Inspection of raw material by Q.A Spring black 1.2mm wire , wire tolerance +/- 0.025mm , No score marks , no rusty wire , compare tensile strength with COA and spec - correct grade.Check wire diameter with micrometer. Visual inspection of condition of wire. COA from supplier. Record on incoming inspection document. Rod spec from supplier.
4500 Move raw material to storage area for storage Move raw material to storage area for storageVisual inspection during this activity . Competent forklift driver , FIFO system to control material
5500 Issue wire to production Correct identification of wireMaterial buff tag Visual inspection
62 Coil and inspect rings SC Correct setting of rings as per drawing requirementsRecord on electronic system
72 Transport rings to LTHT Safe movement using a trolley to transport ringsVisual verification
88 LTHT Safe loading and off-loading of rings. Visual verification
98 Final inspection Rings shall conform to customer/drawing requirements.Record on electronic system
108 Transport completed rings to stores using trolley Safe loading and transporting of ringsVisual inspection
11500 Receive Rings into stores area Correct quantities of ringsVisual inspection Approved transporter
12500 Dispatching of rings Safe handling during this activityVerification of quantities as per sales order and delivery note
13505 Internal product audit As per drawing and audit requirements Competent Q.A personnel conducting inspections