MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2024/08/28
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
Feltex


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving raw material - Stores PersonnelReceivingReceiving Check for correct quantity, delivered, type and diameter on tagVisual inspection and verification as per orderDelivery note and orderEvery batch Goods receive Note Book / Delivery note If non-compliant - contact supplier and inform Quality Manager
2Move Raw Material to incoming inspection areasTransportTransport Store material properlyVisual inspectionAs per proceduresEvery batch N/A - Visual Inspection If difficulty occurs in storing raw material properly, inform Stores Coordinator
3Raw Material incoming inspection by QA PersonnelInspectionInspection Correct Diam - 4.5mm - 4.0mm / 3.5mm +/- 0.08mm Correct type - SWM - B - No rusty wire / no score marks / no excessive drawing soap. COA from supplierVisual insp / MicrometerAs per incoming raw material inspection planEvery consignment Goods receive note book / record findings on incoming inspection record sheet Any non-conforming raw material shall be isolated - properly tagged and placed in quarantine store - inform Quality Manager
4Move Wire to storage area for safe stackingTransportTransport Correct size / correct grades as per FIFO SystemVisual inspectionAs per FIFO SystemOn receiving FIFO Information board and Rack identification Any difficulty experienced during this activit reports to Stores Coordinator
5Issue Raw Material to Production PersonnelIssuingIssuing Correct wire to be issued as per job cardVerification as per buff tagEvery coil issued to ProductionEvery job as per request Job card sheet Should the incorrect wire been issued to Production, stop proces, correct and inform STores Coordinator
6Form wire no 1 - outer wire on Micro - Mac bundle wireFormingForming Part to conform to drawing requirementsCheck part on in-process checking fixtureFirst-off sampling 3 samples - in process inspection 9 samples - last-off 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 22556
22557
22558
1244
Record on BIS Card - record on attribute inspection sheet Should the first-off sampled failed - stop process and re-set machine and redo first-off sample - inform Supervisor
7Form wire no 2 Loop wire on ZukronFormingLoop wire Part to conform to individual checking fixture requirementsCheck part on in process checking fixture . Loop wire must drop fit in checking fixture . Loop legs on both ends must be parallel . Length on loop to be formed correct and locating pin must fit through loop freely . First-off sampling 3 samples - in process inspection - 9 samples to be bundled as verification - last off sample to be kept in the checking fixture First-off at start of shift - in process every hour - Last -off end of shift 22543
22544
22545
1241
Record on BIS Card - record on attribute inspection sheet QD:203 Should the first-off sample failed - stop process re-set machine and redo first off sample - inform Supervisor
8Form wire no 3 Centre wire on Huron / Zukron machine - bundle wiresFormingForming Part shall conform to drawing requirementsCheck part on in process checking fixtureFirst-Off sampling - 3 samples - in process inspection 9 samples - last -off 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 6154
6155
22547
1242
Record on BIS Card - record on attribute inspection sheet Should the first-off sanmple fail, stop process, reset machine and redo first-off sample - inform Supervisor
9Form wire no 4 - (L) wire left hand on Huron / Zukron machine - bundle wiresFormingForming Part shall conform to drawing requirementsCheck part on in process checking fixtureFirst-off sampling - 3 samples In process inspection - 9 samples Last -off sampling - 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 22565
22566
22567
1246
Record on BIS Card - record on attribute inspection sheet Should the first-off sample fail, stop process, reset machine and redo first - off sample, inform Supervisor
10Form wire no 5 outer wire left hand on Zukron - bundle wiresFormingForming Part shall conform to drawing requirementsCheck part on in process checking fixtureFirst-off sampling - 3 samples In process inspection - 9 samples Last-off sampling - 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 22559
22560
22561
1245
Record on BIS Card - record on attribute inspection sheet Should the first-off sample fail, stop process, reset machine and redo first-off sample, inform Supervisor
11Forms wire no 6 - Outer wire right hand on Zukron - bundle wiresFormingForming Part shall conform to drawing requirementsCheck part on in process checking fixtureFirst-off sampling - 3 samples In process inspection - 9 samples LAst-off sampling - 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 22562
22563
22564
1245
Record on BIS CArd, record on attribute inspection sheet Should the first-off sample fail, stop process, reset machine and redo first-off sample, inform Supervisor
12Form wire no 7 - Inner wire on Micro-Mad Machine - bundle wiresFormingForming Part shall conform to drawing requirementsCheck part on in process checking fixtureFirst-off sampling - 3 samples In process inspection = 9 samples Last-off sampling - 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 22572
22573
22574
1249
Record on BIS CArd, record on atttribute inspection sheet Should the first-off sample fail, stop process, reset machine and redo first-off sample, inform Supervisor
13Form wire no 8 (U) wire on Huron / Zukron machine - bundle wiresFormingForming Part shall conform to drawing requirementsCheck part on in process checking fixtureFirst-off sampling - 3 samples In process inspection - 9 samples Last-off sampling - 3 samplesFirst-off at start of shift - in process every hour - Last -off end of shift 22553
22554
22555
1243
Record on BIS Card, record on attribute inspection sheet Should the first-off sample fail, stop process, reset machine and redo first-off sample , inform Supervisor
14Place all formed wires on KANBANSStackingStacking Parts must be properly packed as per part number on Kanban. Kanban qty 400 / as per order requirement.Physically count parts on kanbanSelect wires per batch runEvery new batch Record on BIS Card any discrepancies or difficulty found during this activity shall be reported to Supervisor
15Move loaded KANBANS to welding areaTransportTransport KANBANS must be correctly loaded with correct quantitiesVisually inspect KANBAN to ensure parts are loaded correctlyEvery new KANBANEvery new batch Record on BIS CArd Any discrepancies or difficulty found during thie activity shall be reported to Supervisor
16Load welding jigLoadingLoading Wires shall fit jig properly, no bent wires, no damaged wires, no rusty wiresVisual100%Every new loaded jig Record on inspection sheet Any incorrectly formed wires shall be isolated from production, place in dedicated area - inspect on end of shift - raise NCR
17Welding of framesWeldingWelded frame SC All sections must be welded. Weld pull test required. Visually inspect all welds mark each weld with a paint marking pen . Refer to work instruction - WR/PWI/194100% inspection on all welds . Weld pull to be conducted as stipulated on work instruction no 1053Every batch 1053
Record on BIS Card every hour and weld pull test sheet QD:284 Any frame with loose welds, smash welds , frames not fitting final checking fixture , inform supervisor and place on hold .
18Inspect frame on final checking fixture - and inspect as per work instruction no. 1053InspectionInspection SC Frame shall be flat in jig, no skew wires, no loose/smash welds. pins to fit freely through loops, long loop to fit CF correctly, protruding wire (X3) to be more or less even in legth. Refer CAR no's. 19933, 45315 & 53444.Visual inspection100%Every order 6155
22575
22576
1053
Record on BIS Card Any non-conforming frame found during inspection shall be isolated from production, place in dedicated area, inspect at end of shift - raise NCR
19Pack frames as per customer requirementsPackingPacking Correct quantities as per packaging instruction - 40 frames on specially made trolleysVisual inspection - physical counting of framesEvery containerEvery order 1053
As per work instruction Any difficulty experienced during this activity shall be reported to Supervisor
20Move packed frames to stores areaTransportTransport Correct loading of trolleys and safe handling during transport activityVisualEvery loadEvery order N/A Any damage to boxes during transport activity shall be reported to Stores Coordinator
21Receipt complete quantities into stockCapturingCapturing Correct quantities to be captured into stock systemVisual verificationAs per orderEvery new order F/A Card Any discrepancies shall be reported to Production Supervisor / Production PLanner
22Prepare order as per customer requirementsOrder preparationOrder preparation Correct quantities as per customer order placementVisual inspectionEntire batchEvery new order Delivery note - invoice Any difficulty experienced during this activity shall be reported to Stores Coordinator
23Transport frames to customer as per order receiptTransportTransport Correct loading and safe handling of trolleys during transport activityVisual inspectionEntire batchEvery new order Delivery note - invoice Any difficulty experienced during this activity shall be reported to Stores Coordinator
24Internal AuditingAuditingAuditing All processes, product and systems shall comply to requirementsVerification of process, product and systemsEntire processAs per Audit schedule Audit check sheet All audit findings shall be closed out as per requirements any delays will be reported to Production Manager
25Lay-out inspection and Product AuditInspectionInspection Full dimensional report, and other drawing requirements if applicableProduct audit will cover Layout Inspecting as it is a full dimensional of frame1 PartAs per Audit schedule Audit check sheet Any non conformance shall be reported to Production Manager for correction
26Weld pull test set-upSet-upSet-up SC Select correct setup 4.5x4.5 / 4.5 x 3.5 or 3.5 x 3.5mm wireInspection1 Sample1 test weekly Record on BIS Card and results on inspection sheet Any difficulty experienced during the set-up shall be reported to the Supervisor for corrective action
27Weld pull testTestingTesting SC All weld pull test shall meet the requirements as per the check sheetVisual inspection Read load on tester and record on check sheet1 Sample1 test weekly Record on BIS Card and results on inspection sheet Any weld failures during this test - stop process and inform Supervisor for corrective action