MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2024/11/20
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving verification of raw materials by stores personel
Receiving
Receiving
Check for correct quantity delivered, type, diameter, wire cod ,specification and tensile range
Visual inspection and verification as per order
Delivery note and order
Every batch
Goods Receive book / Delivery note
Should there be any discrepancies inform production planner / supplier immediately and make note on POD
2
Move material to receiving storage area
Transport
Transport
Store material correctly
Visual Inspection
As per FIFO System
Every Batch
Visual inspection and FIFO Board
If difficulty occurs in storing raw material properly inform Stores coordinator.
3
Inspection of raw material by QA personel
Inspection
Inspection
SC
Correct Diam 4.5mm / 6.0mm Correct type SWB No rusty wire / no score marks, tensile -700/900, specification =ASTM /A580/A580M-08, wire tolerance =0.025
Visual Inspection / Micrometer
As per incoming raw material inspection plan
Every Consignment
6163
6180
1120
Goods Receive Note book / Buff tag and record findings on incoming receiving inspection sheet
Any non-conforming raw materials shall be place on hold and isolated. Raise a SRAN and inform stores coordinator
4
Move raw material to dedicated area for storage
Storage
Storage
Safe stacking of wire coils onto racks as per allocated areas and FIFO system
Visual Inspection
As per FIFO System
On receiving
FIFO Information board and rack identification
Any difficulty experienced during this activity report to Stores Coordinator
5
Issue wire to production
Issuing
Issuing
Correct wire to be issued as per job card
Verification as per buff tag Check diameter of wire using vernier
Every coil issued to production
Every job as per request
Route Card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Form outer wire on Huron
Forming
Forming
SC
Form wire as per checking fixture / drawing
Visual inspection. Checking fixture First-off sample In process inspection and last off
First off- In process inspection and last off.
First off at start of production. In process 9 parts every hour to be verified in checking fixture and bundled
6253
1158
Record on line system
Should the first off sample fail - stop process reset machine and redo first off sample - Inform Supervisor
7
Inspect wire form
Inspection
Inspection
Parts shall conform to checking fixture / drawing requirements
Check wire using checking fixture
2 parts as per work instruction
2 every hour
Record on-line system
Any non-conformance shall be isolated. Raise NCR put a hold card and be place in quarantine store. Inform Quality Manager
8
Transport wire to LTHT
Transport
Transport
Correct handling of wire forms during this activity
Visual Inspection
NA
Every job as per request
NA
Any difficulty experienced during this activity report to supervisor
9
LTHT outer wire
Heat Treatment
Heat Treatment
Correct temperature 300 degrees Celsius for 20 minutes
Visual
As per requirements
Every batch
Record temperature on log sheet QD52 for every batch
Any non-conformance shall be isolated. Raise NCR put a hold card and be placed in quarantine store. Inform Quality Manager
10
Form left and right hand box wire on Huron
Forming
Forming
SC
Form wire as per checking fixture / drawing
Visual inspection Checking fixture
2 parts as per work instruction
2 every hour
Record on-line system
Any non-conformance shall be isolated - raise NCR out a hold card and be placed in quarantine store. Inform Quality Manager
11
LTHT left and right hand box wire
Heat Treatment
Heat Treatment
SC
Correct temperature 300 degrees Celsius for 20 mintues
Visual
As per requirements
Every batch
Record temperature on log sheet QD52 for every batch
Any non conformance shall be isolated. Raise NCR put a hold card and be placed in quarantine store. Inform Quality Manager
12
Rill sanding left and right hand box wire
Rill Sanding
Rill Sanding
Rill sanding as per method.
Visual Inspection
Every batch
Every order
NA
Should any difficulty or problem occur report to supervisor immediately.
13
Assemble part
Assembly
Assembly
SC
Assemble as per work instruction
100% inspection on assembly jig
Every batch
Every order
NA
Any problems shall be reported to the supervisor
14
Inspection of frames
Inspection
Inspection
SC
Fits checking fixture Long legs are parallel Box wires should be flat and in line
Checking in final fixture
Entire batch
1 frame every hour
Record on-line system
Any difficulty experienced during this activity report to supervisor
15
Pack finished frames in bins
Packing
Packing
Correct quantity 10 seat back per bin 20 bins per pallet
Visual
As per WIS
Every job
FA Card
Should the quantity be incorrect stop process, verify quantity and add or remove frames to meet quantity required
16
Transport parts to stores
Transport
Transport
Correct bins and correct quantity
Visual Inspection
As per works order
Every batch
FA Card
Should any difficulty occur during transportation inform supervisor
17
Receipt frames to stores
Receipting
Receipting
Correct quantity be into the stock system
Visual
Every batch
Every order
FA Card
Any discrepancies shall be report to stores coordinator
18
Dispatching of frmaes
Transport
Transport
Correct loading of bins and safe handling during transport activity
Visual
Entire batch
Every new order
Delivery Note Invoice
Any difficulty experienced during this activity report to Stores Coordinator
19
Layout function inspection
Inspection
Inspection
Full Dimension
As per fixture and customer requirements
1 complete frame
As per schedule
Audit sheet
Should the functional layout fail the production manager shall be informed immediately
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :