MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2024/08/27
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw materialReceivingRaw material Check for correct quantity delivered, type and diameterVisual inspection and verification as per orderDelivery note and orderEvery batch



1090



Goods receive notebook / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnelInspectionRaw material SPEC. TSG3533G. Material. WIRE/MBH2/0800 SAE 1008 - 8.0mm +/- 0.08mm. Tensile range 550mpa to 750mpa No pitted rust, now score marks, no excessive drawing soap Phosphate coating as per CAR3/18Visual inspection MicrometerAs per incoming raw material inspectionEvery consignment 6179
1120
Record on inspection system Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to dedicated area forstorageStorageRaw material Safe stacking of wire coils on to racks as per allocated areas and FIFO systemVisual inspectionAs per FIFO systemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to productionIssuingRaw material SC Correct wire to be issued as per job cardVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery coil Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Form wire on 12mm HuronFormingProduct SC Form wire as per in-process checking fixture no. CFIX00119, part shall drop fit into the checking fixture. Correct tooling required. Angle required on moulded section - 30 degrees - 35 degrees. Product sits flat and has not lift when placed on a flat surface - Refer CAR No. 53438. Visual inspection, confirm products in the checking fixture. Use a angle finder to check angle.First-off - 5 parts, which is sent through each process to check notching and wire movement. 5 parts to be stamped and coated for each batch First-off at start of production. In-process 9 parts every hour and last-off 14423
15423
15424

1064

Record on Electronic system Should the first-off sample fail stop process and reset machine and re-do first-off
7Notching processNotchingNotched area Correct dimensions on notch as per drawing. Depth of notch 6mm +- 0.02mm as per drawing. No burr after cropping, max burr 0.2mm. correct placement of the parts in the grooves and correct position in order to be notched correctly. Visual check as per Work instructions. Check for burrs using measuring Gauge No. SPRG/TOYO/0064 VernierAs per work instructionFirst-off at start of production. In-process 1 part every hour and last-off 1041
6089
12399
1065
Record on Electronic system Any difficulty notching stop process and inform supervisor
8WashingCleaning TanksProducts Remove oil and rust. Check chemical PH and temps are to specification. If grease remains increase wash time (CAR 3/18 & 2/18)Visual inspection. Refer to work instruction Every batchDaily



1069



Record on QD329 Expoxy Process Parameters Any difficulty during washing stop process and inform supervisor
9Epoxy coating of rodsCoatingCoated rods SC Line speed 43-35 sec/m Oven temperature 190-200 deg Smooth finish, check for pin holes, ripples, score marks Coating thickness 80-125 microns. Refer to work instructionVisual inspection Coating thickness gaugeCoating thickness test 5 readings per rod1 Rod hood per batch 1042
6090
1143
Record process parameters on QD329 Record thickness on system Any difficulty during this process report to supervisor
10Moulding process and final inspectionMouldingProduct SC Check process parameters on QD329. Check for burrs after mould on part Remove flash Check for pinch point below moulded part Fits checking fixture. sliding bar must slide through freely on angle check, angle on mouldd section shall be 30 - 35 degrees. Refer CAR No. 53438.100% Visual inspection of parts in the checking fixture.100% check in checking fixture. Every part 1043
6091
12388



1063
1205



Record every hour on Electronic system Any difficulty experienced during this activity report to Supervisor
11Load pull testLoad pullLoad pull SC Check load > 1000N minimumPull test1 PartWeekly Record results on Load test record sheet QD:304 Any difficulty experienced during this activity report to supervisor
12Taping of spongeTapingProduct Correct fitment of sponge as per drawing Sponge should have no gap after fitmentVisual and using checking fixture POKE YOKE device (PY001) for sponge fitment (CAR15/18). PY001 verified every 12 monthsAs per work instructionEver rod hood 1063
Record every hour on Electronic system Any difficulty experienced during this activity report to Supervisor
13Packing of final productPackingProducts Correct quantity 22 products per bin Blue Bin No 4122 10 bins per palletVisualAs per work instruction Every job

1063

F/A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
14Transport product to storesTransportProducts Correct bins and correct quantitiesVisual inspectionAs per works orderEvery batch F/A Card Should difficulty occur during transport inform Supervisor
15Receipting product to storesReceiptingProducts Correct quantity to be entered on to the stock systemVisualEvery batchEvery order 1094
F/A Card Any discrepancies shall be reported to the Stores Coordinator
16Dispatching of productsTransportProducts Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
17Layout functional inspectionInspectionProduct SC Full dimensiomalAs per customer requirements1 Complete productAs per schedule Audit sheet Should the functional layout fail the Production manager shall be informed immediately.