MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/11/22
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw material by stores personelReceivingRaw material Check for correct quantity delivered, type and diameterVisual inspection and verification as per orderDelivery note and orderEvery Batch 1090
Goods receive notebook / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportRaw material Store material correctly Visual inspectionAs per FIFO systemEvery Batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personelInspectionRaw material SC Correct material 4.5mm +/- 0.045mm spring wire. WIRE/SBS3/0450. Specification - .EN 10204. Tensile range - 1400mpa to 1600mpa. 6mm +/- 0.006mm spring wire. WIRE/SBS3/0600. Specification - .TSG 3531G SWB. Tensile range - 1150mpa to 1350mpa. No pitted rust, no score marks, no excessive drawing soapVisual Inspection / MicrometerAs per incoming raw material inspection QD207Every Consignment 8289
6193
1120
Goods receive notebook / Buff tag and record findings on on-line inspection system. Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to dedicated area for storageTransportRaw material Safe stacking of wire coils on to racks as per allocated areas and FIFO systemVisual InspectionAs per FIFO systemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue Wire to productionIssuingRaw material Issue wire to productionVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery coil Route Card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Form LH & RH box wireFormingProduct SC Form LH & RH box wire as per checking fixtureVisual inspection for fitment in Checking fixture. Parts shall fit in checking fixture.Rotate,angles and Leg lengths correct.First-off sample & In-process inspection and last-off9 Parts every hour 10354
10355
10356
10357
10359
10360

1160

Record on BIS card and on-line inspection system Should the first-off sample fail stop process and reset machine and re-do first-off.
7Form outer wire on HuronFormingProduct SC Form outter wire as per checking fixture, outter wire to sit in checking fixture profile correctly. Legs paralell and not formed too wide. Rotate,angles and Leg lengths correct.Visual inspection for fitment in Checking fixture. Parts shall fit in checking fixture.First-off sample & In-process inspection and last-off9 Parts every hour 10350
10351
10352

1160

Record on BIS card and on-line inspection system Should the first-off sample fail stop process and reset machine and re-do first-off.
8Transport wire forms to LTHTTransportProducts Correct handling of products during this activityVisual InspectionEntire batchEvery job as per request NA Any difficulty experienced during this activity report to supervisor
9LTHTHeat TreatmentProducts SC Correct temperature 300 degrees Celsius for 20 minutesVisual verificationEvery batchEvery job Record temperature on log sheet QD:52 for every batch Any discrepancy shall be reported to supervisor
10Transport products to assembly areaTransportProducts Correct products that fits the checking fixture. correct quantity as per job requestVisual verificationEvery batchAs per job request NA Should any difficulty occur during transportation inform supervisor
11Shoot clips and Assemble product on mould plate AssemblyProducts SC Ensure clips are secure on product and not loose or missing. Assemble mould plate onto product correctly, mould plate clip must be secure on product, no cracks or looseness.100% inspection on assembly jig Every batchEvery order NA Any discrepancies shall be reported to supervisor
12Inspection of completed productsInspectionCompleted product SC Product shall fit in final fixture correctly, product to fit in slots in fixture. Legs must align in the C/F slot and must not be high. Box wire legs on product must be flat. No rust, burrs or surface residue on product and no gap between the mould plate. No missing or loose clips.VisualFirst-off sample & In-process inspection and last-offIn process, 9 parts every hour 9323
9324
9325


1209


Record on BIS card and on-line inspection system Any difficulty experienced during this activity report to supervisor
13Pack products into binPackingCompleted product Correct quantity. 12 Seat backs per bin. Bin No 4633, blue 25 bins per palletPhysical counting of productsas per customer requirementEvery job F/A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
14Transport product to storesTransportProducts Correct quantitiesVisual inspectionAs per works orderEvery Batch F/A Card Should difficulty occur during transport inform Supervisor
15Receipting product to storesReceiptingProducts Correct quantity to be entered on to the stock systemVisualEvery batchEvery order 1094
F/A Card Any discrepancies shall be reported to the Stores Coordinator
16Dispatching of productsTransportProducts Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order 1101
Delivery Note / Invoice Any difficulty experienced during this activity report to Stores Coordinator
17Lay-out inspectionn/aSeat Back product compliance to drawing requirements and customer specifics - full dimensional reportMeasurement of all required dimensions1 Complete productAs per schedule records of all findings should there be any failures, inform customer and production manager