Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2023/08/25
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1070
Receiving raw material - Stores Personel
Receiving
Receiving
Check for correct quantity delivered, type and diameter
Visual Inspection and verification as per order
Delivery note and order
Every batch
Goods Receive Note Book / Delivery Note
If non-compliant contact supplier and inform Quality Manager
1071
Move raw material to incoming inspection area
Transport
Transport
Store material properly
Visual Inspection
As per procedure
Every batch
NA - Visual inspection
If difficulty occurs in storing raw material properly, inform Stores Coordinator
1072
Raw material incoming inspection by QA personnel
Inspection
Inspection
Correct Diam 3.8mm Correct type - SWB No rusty wire / no score marks / no excessive drawing soap
Visual Inspection / Micrometer
As er incoming raw material inspection plan
Every Consignment
Goods Receive Note book Record findings on incoming inspection record sheet
Any non-conforming raw materials shall be isolated. Properly tagged and placed in quarantine store. Inform Quality Manager
1073
Move wire to storage area for safe stacking
Transport
Transport
Correct size / correct grade as per FIFO system
Visual inspection
As per FIFO system
On receiving
FIFO information board and rack identification
Any difficulty experienced during this activity report to Stores Coordinator
1074
Issue raw material to production personnel
Issuing
Issuing
Correct wire to be issued as per route card
Vernier
Every coil issued to production
Every coil
Job card sheet
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
1075
Form spring
Forming
Forming
Form spring as per drawing 432mm - 436mm
Visual inspection Tape Measure
As per WIS
1 every hour
Record on ELECTRONIC SYSTEM
Should the first off sample fail. Stop process reset machine and redo first off sample. Inform Supervisor
1076
Move spring to End Bend
Trasnport
Trasnport
Correct size.
Visual Inspection
As per FIFO system
Every job as per request
NA
Any difficulty experienced during this activity reports to supervisor
1077
Bend spring
Bending
Bending
CC
Bend spring as per work instruction
Visual
NA
1 every hour
RECORD ON ELECTRONIC SYSTEM
Should the quantity be incorrect, stop the process, verify quantity and weight
1078
Move spring to LTHT
Transport
Transport
Correct Spring
Visual inspection
NA
As per job request
NA
Should any difficulty occur during transportation inform supervisor
1079
LTHT
Heating
Heating
Correct temperature 300 degrees Celsius for 20 minutes
Visual
Every Load
Every Order
Heat treatment log sheet Q.D.52/04/16
Any discrepancy shall be reported to supervisor
1080
Transport Spring to form angle
Transport
Transport
Correct loading of boxes and safe handling during transport activity
Visual inspection
Entire batch
Every new order
Delivery Note Invoice
Any difficulty experienced during this activity report to supervisor
1081
Form angle
Forming
Forming
Form angle as per checking fixture
Visual inspection Checking Fixture
Entire batch
Every new order
NA
Any discrepancy shall be reported to supervisor
1082
Inspection of spring
Inspection
Inspection
Correct angle as per drawing
Visual Inspection Checking fixture
First off
Every new batch
NA
Any discrepancy shall be reported to supervisor
1083
Pack spring
Packing
Packing
Correct quantity as per job description
Visual
As per work instruction
Every job
BIS Card
Should the quantity incorrect, stop process, verify quantity and remove/add spring to meet quantity required
1084
Move wire to stores
Transport
Transport
Correct wire as per job card
Visual Inspection
As per route card
As per job request
BIS Card
Should any difficulty occur during transportation inform supervisor
1085
Receipt correct quantity into stock
Capturing
Capturing
Correct quantity be captured into the stock system
Visual
Every load
Every order
FA Card
Any discrepancy shall be reported to Stores Coordinator
1086
Transport spring to customer as per order receipt
Transport
Transport
Correct loading of boxes and safe handling during transport activity
Visual
Entire batch
Every new order
Delivery Note Invoice
Any difficulty experienced during this activity report to Stores Coordinator
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due