MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/09/21
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving and verification of raw materialReceivingReceiving Check for correct quantity delivered, Material 9mm Mild Steel wire in coil formVisual inspection and verification as per orderDelivery note and orderEvery batch Goods receive notebook / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportTransport Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnelInspectionInspection Mid Black Wire WIRE/MBH1/0900 9mm +/- 0.08mm. Material- SAE 1008. Tensile range 550mpa to 750mpa - correct diameter No score marks - no rusty wire, Correct grade, correct tensile - verify material compositions as per spec Visual inspection Micrometer for wire diameter COA from supplier - record findings on incoming inspection documentAs per incoming raw material inspection QD207Every consignment 1047
1120
Goods receive notebook / Buff tag and record findings on incoming receiving inspection no. 1047 Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4Move raw material to dedicated area forstorageStorageStorage Safe stacking of wire coils on to racks as per allocated areas and FIFO systemVisual inspectionAs per FIFO systemOn receiving FIFO information board and rack identification Any difficulty experienced during this activity report to Stores Coordinator
5Issue wire to productionIssuingIssuing SC Correct wire to be issued as per job cardVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery coil Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Straighten wire and cut to length CuttingCut lengths SC Correct cut length = 420mm +/- 1mmVisual inspection Measure with tape measure First-off sample In-process inspection Every batch 1051
2074
22524
Record first-off and in-process inspection 1 part every hour record on BIS card Should the first-off sample fail stop process and reset machine and re-do first-off
7Move part to chamfer toolTransportBent wire form Safe transportation of wiresVisual InspectionEvery batchEvery batch NA Any difficulty report to the supervisor
8Chamfer endsChamferChamfered Wire Chamfer ends. Top Chamfer 1mm +- 0.5mm Bottom Chamfer 1mm +- 0.5mmAs per work instruction - 1051 Measure with a Vernier First-off In process inspectionEvery batch 1052
1056
22527
1051
Record First off and in process inspection 1 part every hour record on BIS card Any difficulty report to the supervisor
9Form bends 1 and 2Formingformed bend 1 - loop and 2 kink Correct length as per drawing , as per fitment on in-process checking fixture. Visual Inspection. As per work instruction - 1054. Verify fitment on in-process checking fixtureFirst-off sample In-process inspectionEvery Batch 1053
1057
22525
1054
Record every hour on BIS Card Any difficulty report to supervisor
10Flatten and form radiusPressPress Wire Form Correct radius Correct diameter of flattened wire Must conform to checking fixture. No unformed parts left lying around that can get mixed in the bin with finished parts. 5S and good housekeeping to ensure separation of good and bad parts.Visual inspection. As per work instruction - 1049. First off In process inspectionEvery Batch 1054
1058
22526

1049

Record First-off and In Process Inspection every hour on BIS card Any difficulty report to supervisor
11Sub-Contract part for GalvanisingSub-Contract ProcessPressed Wire Safe handling of part during transport to sub contractorVisual InspectionVisual InspectionEvery batch NA Any issue report to production manager
12Receive plated part from sub contractorReceivingPlated Part Correct Plating Plating Thickness 5 to 60 microns Visual InspectionSampling Inspection during receivingEvery batch 1055
Receiving Inspection Sheet Any issues report to production planner and quality team leader
13Receipting product to storesReceiptingReceipting Correct quantity to be entered on to the stock systemVisualEvery batchEvery order F/A Card Any discrepancies shall be reported to the Stores Coordinator
14Packing of final productPackingPacking 40 Parts per bin Plastic bin size 4616VisualAs per work instructionEvery job F/A Card Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
15Dispatching of productsTransportTransport Correct loading of bins and safe handling during transport activityVisualEntire orderEvery order Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
16Layout functional inspectionInspectionInspection SC Full dimensiomalAs per customer requiremetns1 Complete productAs per schedule Audit sheet Should the functional layout fail the Production manager shall be informed immediately.