MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2023/08/25
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving raw material - Stores PersonnelReceivingRaw material Check for correct quantity delivered, type and diameter.Visual inspection and verification as per orderDelivery note and orderEvery batch 1090
Goods receive note book / delivery note Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection and FIFO board If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnelInspectionRaw material SC Mild black wire. EN 10204 3.1B WIRE/SBS3/0260. Correct diameter 2.6mm +/- 0.035. Correct tensile - 500mpa to 700mpa.WIRE/MBH2/0500. Correct diameter 5mm +/- 0.08. Correct tensile - 1420mpa to 1620mpa.No score marks, no rust on wire.Visual inspection, MicrometerAs per incoming raw material inspection QD207Every consignment 6159
1120
Goods receive notebook / Buff tag and record findings on electronic sytem Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4 Move material to receiving storage areaTransportRaw material Store material correctlyVisual inspectionAs per FIFO systemEvery batch Visual inspection If difficulty occurs in storing raw material properly inform Stores Coordinator
5Issue wire to productionIssuingRaw material Issue wire to productionVerification as per buff tag Setter to measure wire diameter with vernierEvery coil issued to productionEvery job as per request Route card Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6Straighten and cut wireStraighten and cuCut lengths of wire Wire cut to 215mm +/- 1mm and wire lengths must be straight.Measure with Tape measure Visual inspectionFirst-off at start of production. In-process 1 part every hour and last offFirst-off at start of production. In-process 1 part every hour and last off 12396
12397
12398
Record on Electronic system Should the first-off sample fail stop process and reset machine and re-do first-off
7Bundle wireBundlingCut lengths of wire Correct quantities per bundle +/- 1000 PER BOX VisualEvery batchEvery job BIS Card Should the quantities be incorrect, stop process and verify quantities
8Transport wire cut to production to form hooksTransportCut lengths of wire Safe handling of wire bundles during activityVisualVisualEvery batch N/A Any difficulty during activity inform supervisor
9Form hooks and packForming and packingProduct SC Correct lengths = 180mm +/- 2.4 , hook = 15mm +/- 1.6 and MAX Gap 2mm as per drawing. Hooks must be formed on both endsMeasure length with tape measure Measure hook and gap with vernier Visual inspectionAs per work instruction1 part every hour 12393
12394
12395
1202
Record on Electronic system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
10Transport product to storesTransportProduct Correct bins and correct quantities of 1000 partsVisual inspectionAs per works orderEvery batch F/A Card Should difficulty occur during transport inform Supervisor
11Receipting product to storesReceiptingProduct Correct quantity to be entered on to the stock systemVisual verification.Every batch.Every order 1094
F.A Card. Any discrepancies shall be reported to the Stores Coordinator
12Dispatching of productsTransportCompleted product Use dunage bin size 4316 Pack 1000 parts in each dunnage binVisual verificationAs per job orderEvery order 1101
Delivery note / invoice Any difficulty experienced during this activity report to Stores Coordinator
13Layout functional inspectionInspectionProduct SC Full dimensional as per SDS and PIS.As per customer requirements.1 complete productAs per schedule Audit sheet Should the audit fail, the Production manager shall be informed immediately.