| PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN |  | 
			|   | 1 | Receiving and verification of raw material by stores personnel | Receiving | Raw material |  | Check for correct quantity delivered, type and diameter | Visual inspection and verification as per order | Delivery note and order | Every batch |  | 1090 |   | Goods receive note book / delivery note |   | Should there be any discrepancies - inform Production planner / supplier immediately and make note on POD |  | 
			|   | 2 | Move material to receiving storage area | Transport | Raw material |  | Store material correctly | Visual inspection | As per FIFO System | Every batch |  |  |   | visual inspection and FIFO Board |   | If difficulty occurs in storing raw material properly, inform Stores Coordinator |  | 
			|   | 3 | Inspection of raw material by QA Personnel | Inspection | Raw material |  | Correct material 4.00mm +/- 0.08mm mild wire.WIRE/MBH2/0400. Specification - SAE1008. Tensile range - 550mpa to 700mpa. No pitted rust, no score marks, no excessive drawing soap | Visual inspection, Micrometer | As per incoming raw material inspection plan | Every consignment | 6116 | 1120 |   | Record on on-line inspection |   | Any non-conforming raw material shall be placed on hold and isolated. Raise a SRAN and inform stores coordinator |  | 
			|   | 4 | Move raw material to dedicated area for storage | Storage | Raw material |  | Safe stacking of wire coils onto rack as per allocated areas and FIFO System | Visual inspection | As per FIFO System | On receiving |  |  |   | FIFO information board and rack identification |   | Any difficulty experienced during this activity report to Stores Coordinator |  | 
			|   | 5 | Issue wire to production | Issuing | Raw material |  | Correct wire to be issued as per route card | Verification as per buff tag | Every job as per request | Every coil issued to production |  |  |   | Route card |   | Should the incorrect wire been issued to Production, stop process, correct and inform Stores Coordinator |  | 
			|   | 6 | Form wire on Zukron | Forming | Product | SC | Part shall be formed with the legs flat. Part shall drop fit in the checking fixture. Appearance - No burrs, rust, marks, damage to finish - Refer CAR no. 45329 | Checking fixture verification, visual inspection and verification on a flat surface to check flatness | As per work instruction | First-off at start of production. In-process 9 parts every hour and last-off | 83032150321504 | 1229 |   | Record on on-line inspections |   | Should the first-off sample fail stop process and reset machine and re-do first-off |  | 
			|   | 7 | Pack parts | Packing | Product |  | Correct quantity 500 per box | Visual | as per customer requirement | Every job |  |  |   | F/A Card |   | Should the quantity be incorrect stop process, verify quantity and add/remove parts to meet quantity required |  | 
			|   | 8 | Transport products to stores | Transport | Products |  | Correct quantities | Visual inspection | As per works order | Every batch |  |  |   | F/A Card |   | Should difficulty occur during transport inform Supervisor |  | 
			|   | 9 | Receipting product to stores | Receipting | Products |  | Correct quantity to be entered on to the stock system | Visual | Every batch | Every order |  | 1094 |   | F/A Card |   | Any discrepancies shall be reported to the Stores Coordinator |  | 
			|   | 10 | Dispatching of products | Transport | Products |  | Correct loading of bins and safe handling during transport activity | Visual | Entire order | Every order |  | 1101 |   | Delivery note / invoice |   | Any difficulty experienced during this activity report to Stores Coordinator |  | 
			|   | 11 | Internal product audit inspection | Inspection | Product |  | Full dimensional | Checking fixture verification, visual inspection, verification on a flat surface to check flatness, vernier & micrometer | PIS/ SDS & Quality product audit report | As per schedule |  |  |   | Audit sheet |   | Should the part fail to meet the requirements, the Production manager shall be informed immediately. |  |