Work Instruction ID:   7197  
Work Instruction Number: 1161 Revision No. 0
Old Work Instruction Number:
Description
Date Created: 06/12/2021 16:28:37 Revision Date: 06/12/2021 16:28:37
Created By: Approved By:
StockCode: WorkCentre:
Customer Stock Code:    
       
Job Observation Frequency (Months)      
       
Creator Approval Date: 07/12/2021 09:13:55 Approved Date: 07/12/2021 09:15:52
Document Status: Current    
 
Work Instruction Rows
Line No.Header RowInstruction 
1

SAFETY

Gloves and ear plugs are to be worn throughout this operation.

Be careful of pinch points. Keep fingers clear at all times when the machine is operating.

Edit Delete
2

SETUP & PREPARATION

  • Ensure the machine configuration and setup is complete as per the Setter Training Manual.
    • Daily Maintenance
    • Physical Tooling is correct
    • Correct tool is selected in the machine config
    • Wire thickness is set in the machine config
    • Adjust the overbends by performing a 90/20 setup.
    • Ensure the wire is straightend correctly.

Ensure the correct wire has been issued by validating GRN buff tag against the route card.

On the production system log the time as "Setting."

Load the Part Recipe found in the location "part recipe location" and prepare a First-Off sample.

Once the first-off is correct, on the production system end the "Setting"downtime and enter the job number and operation to start the job.

Enter the first-off inspection results in the production system.

Edit Delete
3

QUALITY CHECKS

The following checks should be performed:

 

  • Do not force the part into the checking fixture.
  • When placed in checking fixture, part shall fit flat in the slots between the pins.
  • All angles, bends and rotation must be correct to fit in correctly in checking fixture.

Examples

Good part - fit CF - Drop fit required.

Part must drop fit in CF

Must align correctly in slots and profile mus be correct

Check right side angle and length in slot

Check left side angle and length in slot

Not Good part - not fitting CF 

Part not fitting in CF - unacceptable

Wire bent/ not fitting CF

Skew wire/ rotate off: not formed correctly

Edit Delete
4

QUALITY INSPECTION

  • The Last-off from the previous batch is to be compared to the current batch First-off. Last-off is to be placed in the production run.
  • Complete a First-off before comencing with production, record on system Inspection no 7266
  • First-off sample to be tagged and remain with the checking fixture.

 

  • Conduct in-process inspections every hour and record on system Inspection no. 7267

 

  • At the end of the batch, last part is to be tagged and kept with the checking fixture. First-off is to be placed in the production batch
Edit Delete
5

REJECTS

  • All reject parts are to be placed immediatley in the red reject bins provided.
  • All rejects should be logged on the system hourly. 

Scrap / Reject bins are to be emptied at the end of end job or at the end of shift if the job is running at the end of shift

Edit Delete
6

PERFORMANCE TARGETS

Once the job has been logged on the system, you will be able to see the production figures and targets including

  • The Total Qty made against the job
  • The quantity prodcued on the shift (day),
  • The Std Time and the number of Parts required to be made per hour.

The picture to the left provides and example.

Production figures are to be logged on the system every hour.

Edit Delete